Structural Steel Erection Texas
From procurement through erection, we manage your structural steel package. Expert fabrication coordination and field erection for industrial buildings.
Structural steel provides the framework for industrial buildings requiring long spans, heavy loads, or complex configurations. From procurement through final bolt up, managing structural steel requires coordination across engineering, fabrication, and field installation. Our steel teams handle this complete scope, delivering erected structures ready for subsequent building work.
Steel procurement on industrial projects involves significant lead time and coordination. Mill lead times, fabrication schedules, and delivery logistics must align with construction schedules. We manage these variables to ensure steel arrives when needed without delays that impact overall project delivery.
Field erection transforms fabricated components into building structure. Our erection crews operate the equipment and possess the skills to set steel safely and efficiently. Connection completion, alignment verification, and quality documentation confirm structures meet design requirements.
Ideal Applications
- High bay industrial structures
- Crane served buildings
- Long span warehouse construction
- Manufacturing facilities
- Multi story industrial buildings
What We Deliver
Steel Procurement
- Fabricator solicitation and selection
- Contract negotiation
- Shop drawing review
- Fabrication progress tracking
- Delivery coordination
- Material receiving and inventory
Steel Erection
- Erection planning and sequencing
- Crane selection and operation
- Column and beam setting
- Connection installation
- Alignment and plumbing
- Decking installation
Quality Assurance
- Bolt tensioning and inspection
- Weld inspection coordination
- Alignment verification
- Documentation and reporting
- Punch list resolution
- Final acceptance coordination
Project Specifications
Steel procurement begins during preconstruction with fabricator selection and scheduling. We solicit proposals from qualified fabricators, evaluate capabilities and capacity, and establish procurement agreements that align with project schedules. Early engagement prevents schedule conflicts as steel demand fluctuates.
Fabrication coordination ensures steel is produced correctly for field installation. We review shop drawings, track fabrication progress, and coordinate delivery sequencing. Resolving coordination issues during fabrication prevents costly field modifications.
Erection planning determines safe, efficient field installation. Crane selection, erection sequence, and connection procedures are planned before steel arrives. Our erection plans address the specific requirements of each structure while maintaining safe operations.
Quality verification confirms structural integrity. Bolt tensioning, weld inspection, and alignment verification ensure structures meet specifications. Documentation provides the record required for building permits and long term reference.
How We Execute
Procurement Planning
Select fabricator, establish schedule, and initiate shop drawing production.
Fabrication Coordination
Review shop drawings, track production, and coordinate delivery logistics.
Erection Preparation
Develop erection plans, mobilize equipment, and verify anchor bolt locations.
Steel Erection
Set columns, beams, and bracing. Complete connections and install decking.
Quality Verification
Complete inspections, verify alignment, and document final conditions.
Why Choose Us
Schedule Management
Proactive procurement and fabrication tracking prevents steel related delays.
Coordination Control
Managing procurement through erection eliminates gaps between responsibilities.
Quality Focus
Consistent quality standards from fabrication through field installation.
Safety Performance
Experienced erection crews maintain safe operations throughout steel work.
Cost Control
Competitive procurement and efficient erection optimize steel package costs.
Common Questions
What is typical lead time for structural steel fabrication?
Structural steel lead times typically range from 8 to 16 weeks from drawing approval to delivery. Lead times vary with fabricator workload and project complexity. Complex connections or specialty requirements may extend timelines. We recommend early steel procurement.
How do you handle steel coordination with other trades?
We participate in BIM coordination when used and conduct traditional coordination reviews otherwise. Resolving conflicts between steel and other systems during design prevents field problems. Our coordination process identifies issues early when corrections are economical.
What safety measures are used during steel erection?
Steel erection safety includes fall protection systems, controlled access zones, and rigorous crane operation procedures. Our erection teams maintain current certifications and follow OSHA steel erection standards. Safety planning addresses specific conditions of each project.
Do you handle structural steel repairs and modifications?
Yes. We perform steel repairs, reinforcement, and modifications to existing structures. Work may include connection repairs, member replacement, and capacity upgrades. Engineering evaluation guides repair and modification approaches.
How are structural steel connections inspected?
Bolted connections require tension verification using calibrated wrenches or direct tension indicators. Welded connections require visual inspection and may require NDT such as ultrasonic or magnetic particle testing. Inspection requirements follow specifications and codes.
Related Services
Manage Your Steel Package in Texas
From procurement through erection, we deliver structural steel on schedule. Contact us to discuss steel services for your project.
Steel lead times are significant. Start procurement planning early.